Egis wins the lines 3 and 4 of Casablanca Light Rail Transport

Morocco
Casablanca
Client: Casa Transport S.A.
Project manager: groupement Egis (representative), Novec, Atelier A1
Beginning of the works: Beginning of 2019 (36 months)
Opening of T3: 2021
Opening of T4: 2022

Project overview

In 2014, at the issue of a study carried out by Casa Transport S.A. to modernise the public transport system on reserved lanes, two new tramway lines were defined :

  • Line T3 (about 14km) connecting the Ben M'sick,Sidi Othmane and Sbata borrows to the Casa-Port train station via boulevard Mohamed VI
    Line T4 (about 14km), connecting the industrial zone Moulay Rachid to the mosque Hassan II, passing through the city centre

This project will provide a new approach of mobility in Casablanca. Once completed, almost 315,000 passengers are expected on these two lanes every day.

Tramway network in Casablanca scheduled by 2021 :

Our missions

Egis, leader of the French-Moroccan consortium Egis - Novec - Atelier A1 will be in charge of the Engineering Procurement and Construction Management for lines 3 and 4 of Casablanca LRT in Morocco.

After assisting Casa Transports in the preliminary design project, the consortium will now provide the engineering services for the construction sites of the next two tramway lines, of the maintenance facility as well as of the rolling stock.