EPCM of Sidi Bel Abbès LRT line 1, Algeria

Sidi Bel Abbès is a medium-sized town in Algeria, with a population of 300,000 people, situated 80 km from the coast.

Algeria
Sidi Bel Abbès
Date : 04/2011 - 07/2017
Client: EMA (Entreprise du Métro d’Alger)
The Algerian MinisOpening of the first tram line: July 2017

Project overview

The city has decided to introduce a light rail system into its transport network. A feasibility study recommended a network made up of three lines.

It considered as a priority a 14 km line running from north to south. Its construction involved three civil engineering structures: a viaduct and two rail underpasses, one of which is a tunnel approach. The extension of this first line by 3.5 km is already under consideration.

Our missions

Within this huge project, Egis was responsible for :

  • reviewing the feasibility studies,
  • organisation and supervision of the topographical and geotechnical surveys,
  • preliminary design, including systems, civil engineering, civil engineering structures and operations,
  • the preparation of the tender procedure,
  • filtering and sorting constructors' bids,
  • assistance with contract award,
  • organisation and management of public utilities relocation plans and supervision of the ensuing work,
  • management and coordination of the engineering works,
  • cost monitoring and scheduling,
  • scheduling, planning and coordination of the entire project.