Consuming, emitting, returning: managing a data centre’s environmental footprint
A data centre consumes shared resources, emits heat and noise, and can return energy to its local area. However, these resources and environments are themselves subject to growing pressures, which are exacerbated by climate change: strained electricity grids, droughts, and more frequent and intense heatwaves. Each of these flows therefore represents both a dependency for the site and a strain on the local area. Managing them from the very outset of the site selection process means safeguarding the resilience of both.
Electricity: the most sought-after resource
The primary limiting factor in establishing a data centre is no longer land availability, but electricity capacity. In July 2026, RTE had more than 200 industrial projects awaiting connection, totalling around 33 GW, including numerous data centres. In the Île-de-France region, data centres account for 97.5 per cent of the power contracted by new consumers, representing around 7 GW of projects currently being connected – nearly half of the region’s peak consumption. These megawatts are also in high demand for the electrification of industry, transport and housing. Choosing a site therefore involves making trade-offs: proximity to urban areas facilitates the recovery of waste heat and reduces latency, but it concentrates pressure on the grids and increases environmental impact. A more remote site, suitable
This competition takes on a whole new dimension in a crisis situation. A data centre often shares the same power supply as critical facilities: hospitals, care homes, drinking water treatment plants and emergency services centres. In the event of strain on the grid, French regulations provide for rolling blackouts, from which priority users – those for whom a power cut would endanger lives – are protected. However, this protection is subject to a limited power allocation, amounting to around 38 per cent of a department’s capacity. The more the local load is concentrated on a few very large consumers, the less room for manoeuvre there is for grid operators. Ireland has experienced this first-hand: data centres there consumed 23 per cent of the country’s electricity in 2025 and are heavily concentrated around Dublin, where the grid is already under strain. Faced with risks to security of supply, new connections there were, in effect, suspended for several years. Since December 2025, the regulator has only authorised them on condition that the site has controllable generation or storage capacity, either on-site or nearby, equivalent to its connection capacity, and that this capacity participates in the electricity market.
Yet the data centre can become an ally of the grid rather than a competitor to essential services. Its batteries, generators and the thermal inertia of its cooling system offer potential for flexibility: temporarily reducing its consumption from the grid during peak periods, or even contributing to the stability of the system. RTE has been trialling this since 2025 with Data4 and Schneider Electric on the Marcoussis campus, and a joint RTE-Enedis portal – the rules for which were approved by the Energy Regulatory Commission in July 2026 – now enables these services to be remunerated at a local level, on a trial basis in ten departments in the south-west. However, this must be planned for right from the design stage: identifying sensitive users connected to the same substation, calculate the contracted power as accurately as possible (data centres connected to the transmission grid currently consume around 20 per cent of their contracted power), define the conditions for load shedding during a crisis and measure its effects on the surrounding area, as switching to generators also generates noise and emissions.
For Egis, this consideration must be taken into account right from the site selection stage. Network capacity, regional development prospects, priority uses within the area and opportunities for energy flexibility are now criteria that are just as fundamental as land availability or digital connectivity. This approach is currently being implemented across several large-scale projects in France, where analysing the interactions between the data centre and the region’s energy infrastructure is a key element of the design process.
Water: how much, when and where?
Water is the second key consideration, and undoubtedly the subject most beset by misconceptions. The image of the data centre as a ‘water guzzler’ stems mainly from large American campuses cooled by evaporative cooling towers in hot climates. It reflects neither the diversity of available technologies nor the reality in France.
The figures speak for themselves. According to Arcep, the approximately 160 data centres monitored in France, operated by 23 colocation providers, withdrew 575,000 m³ of water in 2024 – a 15 per cent year-on-year decrease – whilst consuming 2.7 TWh of electricity. This is equivalent to the annual consumption of a town with a population of around 10,000. Relative to their electricity consumption, this volume remains well below the commonly cited global average of 1.8 litres per kWh of IT power.
It all comes down to the choice of cooling system. An open evaporative cooling tower is the most water-intensive solution; an adiabatic system, used only during heat peaks, consumes far less; air-cooled chillers, free cooling or direct liquid cooling in a closed circuit combined with dry air coolers consume virtually no water. In a temperate climate, free cooling covers the majority of hours throughout the year. As for liquid cooling, which is becoming essential given the density of AI servers, it operates in a closed loop: the water circulates; it is not consumed. In other words, in a liquid cooling system, water is primarily a heat transfer medium rather than a consumable resource. This fact remains largely unknown, even though it represents one of the major developments in next-generation digital infrastructure.
That is not to say, however, that the issue should be downplayed. Three areas of concern remain. Firstly, the trade-off between water and energy: reducing water use generally increases electricity consumption, and therefore the amount of water indirectly used to generate that electricity. When this is taken into account, the water footprint of the centres monitored by Arcep will reach nearly 6.5 million m³ in 2024. Secondly, the nature of the resource: almost all the water abstracted today is drinking water. Finally, the concentration over time: demand peaks during heatwaves, precisely when water supplies are under the greatest strain and restrictions on use are in place.
The right question is therefore not ‘how much water does a data centre consume?’, but ‘how much, when and where?’. Choosing technology suited to the local climate and the state of the water supply, designing systems to cope with future heatwaves without relying on drinking water, utilising alternative resources (rainwater, treated wastewater) for residual needs, and reporting on a measured water use efficiency (WUE) indicator: water efficiency is becoming a design criterion in its own right, on a par with energy efficiency. With this in mind, the use of non-potable resources, particularly treated wastewater where locally available, must be considered from the earliest stages of the project. These solutions cannot generally be added at a later stage: they require planning ahead to anticipate needs, connection infrastructure, regulatory constraints and the local partnerships necessary for their implementation.
However, this analysis cannot be carried out in isolation from the local context. The availability of water resources, climate projections, the region’s vulnerability to droughts and the potential for using alternative water sources must all be taken into account at a very early stage. It is this regional approach that Egis applies in its studies in order to strike the best balance between energy efficiency, water conservation and resilience.
What the site emits: heat and noise
A data centre releases most of the energy it consumes back into the atmosphere, in the form of hot air expelled by chillers and air-cooled units. In urban or peri-urban areas, this waste heat, combined with large areas of rooftops and paved roads, can exacerbate the local heat island effect, particularly during heatwaves, when local residents are most vulnerable and the equipment is operating at full capacity.
Noise is the other major nuisance: fans running continuously, day and night, and periodic testing of the generators. Often underestimated during the planning stage, these noise issues frequently fuel local opposition.
Water and electricity consumption, heat, noise, competition with other land uses: data centres are now under close scrutiny by local residents, elected representatives and government departments. Acceptability is no longer a peripheral issue. It determines whether planning permission is granted and the project timetable. The direction of exhaust air, greening, acoustic screens and enclosures, and the scheduling of tests: these decisions are best integrated right from the conceptual design stage, when they are least costly. Beyond simply complying with regulatory thresholds, the challenge lies in understanding the project’s actual effects on its environment. In the Bordeaux region, our teams therefore carried out a specific study aimed at assessing a data centre’s potential contribution to the local heat island effect. The results helped guide several design decisions to limit the project’s thermal impacts on its immediate surroundings.
What the site can deliver
A data centre can also become an asset for its local area. Waste heat from server cooling, which is available continuously, can supply district heating networks, public facilities or industrial processes, and contribute to their decarbonisation. However, this potential must be translated into concrete commitments: the authorities now expect evidence rather than mere intentions.
District heating networks represent the most significant outlet for this. In Saint-Denis, Equinix’s PA10 data centre has been supplying the SMIREC district heating network since June 2024: recovered at 28 °C and then raised to 65 °C by heat pumps, its waste heat – up to 6.6 MW – heats the Olympic Aquatic Centre and the Plaine Saulnier urban development zone, over 75 per cent of which is powered by renewable and recovered energy, and prevents around 1,800 tonnes of CO₂ emissions per year. On a completely different scale, in Espoo, Finland, Microsoft’s data centres are set to eventually cover around 40 per cent of Fortum’s district heating network’s requirements.
What was previously a voluntary initiative is now becoming a requirement: from 1 January 2026, data centres with a capacity of at least 1 MW must recover their waste heat, with a heat recovery factor (ERF) of at least 0.20, or demonstrate through a cost-benefit analysis that this is not feasible. However, these projects cannot be improvised: they require a nearby network and sufficient heat demand, and must take seasonality into account, as demand is low in summer whilst the data centre produces heat all year round. They also create an interdependence: if the data centre shuts down, the network must be able to rely on backup generation, such as the gas-fired boiler that safeguards the network supplied by a data centre in Bailly-Romainvilliers, in Seine-et-Marne. Thinking about heat recovery therefore also means thinking about the resilience of the data centre–heat network pairing.
For designers, the challenge is no longer simply to optimise the building’s performance, but to identify potential synergies with the local area and neighbouring infrastructure right from the early stages of the project. In Île-de-France, we assisted a project developer in putting together their application for prior approval, a procedure specific to the Paris region. As part of this, the operator of the relevant district heating network undertook to recover waste heat from the future data centre even before the building permit had been granted. This proactive approach illustrates how expectations are changing: the contribution data centres make to their local communities is gradually becoming a key factor in their acceptance.